In Nuts And Bolts factory, one
machine produces only nuts at the rate of 100 nuts per minute and needs to be
cleaned for 5 minutes after production of every 1000 nuts. Another machine
produces only bolts at the rate of 75 bolts per minute and needs to be cleaned
for 10 minutes after production of every 1500 bolts. If both the machines start
production at the same time, what is the minimum duration required for
producing 9000 pairs of nuts and bolts?
a. 130 minutes
b. 135 minutes
c. 170 minutes
d. 180 minutes
Machine A takes 15 min to produce 1000 nuts with clean time. machine B takes 30 min to make 1500 nuts with clean time . So B is slower. So with B 900 nuts will be made in 180 mins but at last round cleaning time of 10 min no need to count hence 170 mins